The works progress with the execution of the ventilated floor screeds in the basement floor with prefabricated modules of recycled polypropylene that cannot be recovered. These are easily assembled into a continuous formwork and are quickly set up on site.
In addition, this month the ramp wall was built on one side only, with the other side remaining in contact with the ground. In the image you can see the different strata of the terrain.